Viewing 3 posts - 1 through 3 (of 3 total)
Thanks for the book references....I was wondering if had move each cost into their seperate tables, where the budget costs is record 1st of every month and the actual cost...
January 14, 2014 at 7:19 am
#1679884
For phase 1, they need to be measure by the month level only which is the reason why I feel they should be on the same record, but in the...
January 14, 2014 at 7:01 am
#1679876
Why????
January 14, 2014 at 6:51 am
#1679872