Krasavita (7/28/2009)
I have Transaction job running at 4:00 and optimization job running from 3:40 to 4:40. Can they run at the same time?Thank you
If the optimization job is running from 3.40 to 4.40 and your transaction log backup job starts at 4, obviously these two jobs will overlap.
I assumed transaction job means transaction log backup job. Is it something else?