Switch between identical cubes

  • Is there an automated way of switching between two identical cubes. I want to create TwinCube1(production) and Twincube2(Copy of Twincube1). Process Twincube2 during business hours, after completed rename twincube2 as Twincube1.

    Thanks

  • Here is a blog post that describing your switching scenario: http://kevinmintmier.wordpress.com/tag/xmla/

    If you use a scheduling agent, you would be able to execute the alter command after the processing command.

Viewing 2 posts - 1 through 1 (of 1 total)

You must be logged in to reply to this topic. Login to reply