HI,
1.suppose the currnet drive of backup is (N:Drive 100 Gb ) removed from cluster and
2.assigned with same drive letter (N:Drive 200 Gb ) cluster
3. is the scheduled backup in the drive executes??? in the drive which is added now (N:Drive 200 Gb ) in the place of previous (N:Drive 100 Gb)
4. is it required to reconfigure the Backup maintenance plans ?