February 10, 2010 at 1:13 pm
We have around 110 subscriptions on a single report and had set these to all run on one shared schedule. We found that many of these subscriptions were failing though so we thought maybe the pure number of subscriptions trying to run at the same time was causing these failures.
So, we divided these 110 subscriptions into 4 groups and created 3 additional shared schedules that are spaced out within a few minutes of eachother. So we now have between 25-30 subscriptions on each of the four shared schedules.
This seemed to help matters but we still are seeing about 10-15 of these fail each time it runs. We don't see anything that links these 10-15 together and they seem to be random from month to month.
Has anyone else run into this situation?
February 16, 2010 at 10:24 am
yes and was same issue
we also divided the subscriptions and it worked.
JV
February 16, 2010 at 11:16 am
How many subscriptions did you have and how many did you group into a single group?
Viewing 3 posts - 1 through 2 (of 2 total)
You must be logged in to reply to this topic. Login to reply