December 4, 2011 at 5:19 pm
Hi
I am new bie.
I have a test system in which the profiler traces are running and I have access to it.
I have a development system with SQL server 2000(a clonning of the production system and I can login remotely from my computer). I have to replay the traces in the 2000 server, run the perfmon and have to generate a report and setup a baseline for comparison.
1) I have the trace files running in the test system but that test system is just to store data and I have access to the trace files there and I don't have them running in the the SQL server 2000.
Is it possible to replay those traces in the 2000 box to which I am remotely connected ?
2) There are lot of issues with deadlocks and stored procedures.
What are all the considerations to check the baseline while running the replay ?
If I could get a step by step procedure, it would be of great help.
Thanks in advance.
December 8, 2011 at 3:25 pm
if you have not got this figured out yet. save you trace file. then move it the server you want to run it on
Then go the profiler on the test server, go to open, choose Trace File, Select the trace file that was moved.
Then go Replay and you get stop ans start it there.
hope the helps
Viewing 2 posts - 1 through 1 (of 1 total)
You must be logged in to reply to this topic. Login to reply