October 27, 2010 at 9:19 pm
I had a request for a basic article on how to schedule a trace. This article should assume someone knows how to create a custom server side trace. Show one that you've created and then go over how to schedule with T-SQL and/or SSMS
October 27, 2010 at 10:41 pm
You mean like http://www.sqlservercentral.com/scripts/66808/?
Wayne
Microsoft Certified Master: SQL Server 2008
Author - SQL Server T-SQL Recipes
October 28, 2010 at 5:44 am
I'll write up something on this.
"The credit belongs to the man who is actually in the arena, whose face is marred by dust and sweat and blood"
- Theodore Roosevelt
Author of:
SQL Server Execution Plans
SQL Server Query Performance Tuning
October 28, 2010 at 8:23 am
That script sets up a simple trace, but doesn't go through scheduling it for a period of time to run. It would be good to have a short explanation of how to schedule it via T-sQL and/or SSMS.
October 28, 2010 at 4:40 pm
ive done this, and would love to write up something.
January 3, 2011 at 8:46 am
Closing this one as complete.
Viewing 6 posts - 1 through 5 (of 5 total)
You must be logged in to reply to this topic. Login to reply