Package Execution Succeed through Scheduling a job.

  • The job is being executed at the scheduled time but the data is not transfered to the destination table.So is there any option to set for the data to be transfered.

  • Hey Kothari,

    Please be a bit more specific as to what your source, destination and transformation is.

    Also, in your job history, expand and look at the detail for the specific job step responsible for transferring the data.

    Try and enable package logging with as much as possible, as this should also tell you how many rows are being read at source, and being transferred to destination.

    Good luck

    ~PD

Viewing 2 posts - 1 through 1 (of 1 total)

You must be logged in to reply to this topic. Login to reply