April 13, 2010 at 5:48 pm
I need to figure out a way to run drill through report based on a pie chart.
I've created the reports but I can't figure out how to run a drill through report based on each section of the pie chart. I can create one drill through for the entire chart but not for each specific section.
Thanks in advance
-WM
April 14, 2010 at 1:55 pm
Someone has to know how to do this...
April 26, 2010 at 7:34 am
I think that using the available values within your chart series as parameters will get you on the way (set the hyperlink at the series level, not at the chart control's level)
April 27, 2010 at 2:16 pm
Just in case anyone has the same problem
I was able to create the drill through on the label by right clicking the label and selecting action from the dialog box. Basically the same approach can be used to run the drill based on a pie slice. You just have to right click on a slice and select the action from the box...
-WM
Viewing 4 posts - 1 through 3 (of 3 total)
You must be logged in to reply to this topic. Login to reply