April 21, 2017 at 5:23 am
Hi All, we need help regarding the backup plan strategy. we want to create a procedure where in schedule a weekly backup plan and delete old backup but with check condition. once the backup is successful completed then delete old backup otherwise don't delete the old backup. how to use with check condition
April 21, 2017 at 5:31 am
Use Ola Hallengren's solution. Thousands already do, so it's very robust.
John
April 21, 2017 at 6:19 am
John Mitchell-245523 - Friday, April 21, 2017 5:31 AMUse Ola Hallengren's solution. Thousands already do, so it's very robust.John
Thomas Rushton
blog: https://thelonedba.wordpress.com
April 21, 2017 at 6:45 am
ThomasRushton - Friday, April 21, 2017 6:19 AMJohn Mitchell-245523 - Friday, April 21, 2017 5:31 AMUse Ola Hallengren's solution. Thousands already do, so it's very robust.John
Thanks,
April 21, 2017 at 7:06 am
I'd also consider taking a look at Minion Backup. It does quite a bit of stuff that Ola's scripts do not.
"The credit belongs to the man who is actually in the arena, whose face is marred by dust and sweat and blood"
- Theodore Roosevelt
Author of:
SQL Server Execution Plans
SQL Server Query Performance Tuning
Viewing 5 posts - 1 through 4 (of 4 total)
You must be logged in to reply to this topic. Login to reply