Change Control

  • I am not sure where to post this type of enquires, if someone know pls move to that category.

    I am using Embaracadero change mgmt to track my schema changes. I want to use this with SVN so tht if there are any changes in the schema it has to update every date with the latest version.

    I am trying to use the cmd line script generated from Embaracadero and create a windows job, but not much into these tools, could anyone guide me in a proper way to get this job done efficeintly.

    thanks.

  • Sorry Mike, I've never used either. Hopefully, someone that has will see this...

    ...yeah... I'm "bumping" Mike's post because he didn't get an answer and I'm curious as well... 😀

    --Jeff Moden


    RBAR is pronounced "ree-bar" and is a "Modenism" for Row-By-Agonizing-Row.
    First step towards the paradigm shift of writing Set Based code:
    ________Stop thinking about what you want to do to a ROW... think, instead, of what you want to do to a COLUMN.

    Change is inevitable... Change for the better is not.


    Helpful Links:
    How to post code problems
    How to Post Performance Problems
    Create a Tally Function (fnTally)

Viewing 2 posts - 1 through 1 (of 1 total)

You must be logged in to reply to this topic. Login to reply