October 14, 2022 at 11:34 am
Hi!
I need to schedule backup on each Friday and need to keep 4 backups.
We are using ola hallengren script, what should be the retention for this requirement?
Thanks in advance.
October 14, 2022 at 1:14 pm
@CleanupTime is in hours. Four weeks is 672 hours.
October 14, 2022 at 1:18 pm
There are probably an infinite number of ways to schedule a backup. However, most people will use SQL Agent, which is built right into SQL Server instances (assuming you're not running Express, in which case, do a search for scheduling tools, some are built into the OS, some are easily downloaded for free).
"The credit belongs to the man who is actually in the arena, whose face is marred by dust and sweat and blood"
- Theodore Roosevelt
Author of:
SQL Server Execution Plans
SQL Server Query Performance Tuning
October 14, 2022 at 3:15 pm
Hi!
I need to schedule backup on each Friday and need to keep 4 backups.
We are using ola hallengren script, what should be the retention for this requirement?
Thanks in advance.
Have you checked to see if you have room for FIVE backups plus growth for the future? And what of the Transaction Log/Diff backups? Do you have room for FIVE sets plus growth?
--Jeff Moden
Change is inevitable... Change for the better is not.
October 16, 2022 at 6:33 am
This was removed by the editor as SPAM