How to create calender as report perameter.

  • Can any one explain me, How to create calender box as report perameter.

  • IIRC, the calendar box appears by default in Report Manager if the parameter datatype is set to date

    If the parameter datatype is set to text, the calendar box does not display even if the parameter is acting on a date field

  • Okay thank u very much quan.

Viewing 3 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic. Login to reply