I want to run one stored procedure for every 5 minutes.
So how can I make a schdule for that One?
arvind.1611
SSC Enthusiast
Points: 105
July 4, 2011 at 5:05 am
#1347744
You need to create a new job for the same. In the job's step insert the sp you need to run.
You can then schedule it using the schedule tab on the left and set the desired frequency.