September 14, 2005 at 7:33 am
Can anyone advise me of the correct procedure or direct me to documentation regarding recovering the master database from a production active/passive cluster to a cluster set up for a Disaster Recovery test? The DR cluster is configured exactly the same as the production cluster. I'm just unsure of the steps needed to recover the master from a backup from the production cluster to the DR test cluster.
thanks,
Sherri
September 15, 2005 at 10:40 am
Here's a good thread that might help (look for Randy Petty) ...
http://www.sqlservercentral.com/forums/shwmessage.aspx?forumid=5&messageid=163479
Now a great article - this is step by step on how to evict a node and join a cluster
http://www.databasejournal.com/features/mssql/article.php/10894_3467291_1
And a few miore links with 'other' good information:
http://support.microsoft.com/default.aspx?scid=kb;en-us;835185
http://msdn.microsoft.com/library/default.asp?URL=/library/psdk/sql/ad_clustering_7t9v.htm
http://support.microsoft.com/default.aspx?scid=kb;en-us;259267
http://support.microsoft.com/default.aspx?scid=kb;en-us;174799
http://support.microsoft.com/default.aspx?scid=kb;en-us;254321
RegardsRudy KomacsarSenior Database Administrator"Ave Caesar! - Morituri te salutamus."
Viewing 2 posts - 1 through 1 (of 1 total)
You must be logged in to reply to this topic. Login to reply