May 10, 2011 at 8:22 am
Hi,
I have this SQL server 2005 instance where a maintenance plan is in place -
1. Daily full backup - at 12:30AM
2. Hourly log backup - starts 12:00AM
Issue is that the Tlog backup job run at 12:00AM fails, rest all runs in the day are going good.. this is a daily observation.
The system has enough space, so space issue is ruled out as root caise. No system errors in eventlogs as well.
My conclusion comes to a point where I have to bring in the "date" change into picture.
The last full backup which is the reference for all Tlog bckups is at previus day 12:30AM. (eg 5/9)
My tlog bkup at 12:00AM will be at next date (5/10).
So does this make the full backup "invalid" in some way ?
All later backups (full at 12:30AM and consequent Tlog backups at 1:00AM, 2AM etc) are all successful.
Is system date change causing the problem ?!!
Thanks in advance for inputs !!
May 10, 2011 at 9:16 am
My bad ...
didn't check the "Backup set expiry" setting before posting the question. This was set to "1 day", so naturally at 12:00AM the last backup becomes invalid ...
to avoid that one failure, changed the schedule, full backup at 12AM and hourly log backups starting at 12:30AM 🙂
Thanks !!
Viewing 2 posts - 1 through 1 (of 1 total)
You must be logged in to reply to this topic. Login to reply