March 8, 2011 at 5:23 am
Hi
I am intending to have a master package (level 1) that calls 3 child packages (level 2) in sequence.
The first level 2 child package will execute 6 child packages simultaneously
If one of the level 3 packages fails then I want the level 2 package to fail also thus preventing the other level 2 packages from running. However I still want the other level 3 packages to complete and finish.
I assume I have to run the child packages as OutOf Process= false, but if a level 3 package fails (and thus fails the parent level 2 package) will this affect the running of the other level 3 pacakges running in parallel .. will they stop as well
March 8, 2011 at 5:48 am
Tim
No, they won't. As long as there are no precedence constraints between the level 3 packages, they'll all run to completion (whether that be success or failure).
John
March 8, 2011 at 6:24 am
Thanks John
Regards
Tim