Ya, ya, ya - I know I'm still using a SQL 2000 MSX :crazy:. I'm working on it.
Anyway, is it possible to push jobs to a 2008 TSX from a 2000 MSX? I'm able to point the 2008 TSX at the 2000 MSX but my jobs are not getting processed. The MSX is reporting unread instructions by the 2008 instances. Am I missing something?
thanks
BLP