need help with graph

  • i need 2 show graph of machin production in this way:

    1.i have dataset with the machin efficiency in percentage(from 0-100) every 10 minutes.

    2.i have dataset with the machin sttopages(0-stop,1-work) with the the timestamp(can be anything).

    now i need to show in one line graph - one line for the efficiency and one line for the work/stop

    any idea???

  • well,no one know???

  • Sounds like you need a dual axis chart, which I don't think is available in AS. If you find it is, pls let me know!

    Steve.

Viewing 3 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic. Login to reply