How to copy paste measures from one table to table to another in .bim file, in Visual studio

  • I have created about a hundred aggregate measures in one table , which need to be copied to another table in the same tabular model.I can copy and paste the measures only one by one. And after one measure is copied and pasted, i need to process the first table, to be able to copy and paste the second one. This is very time consuming. Is there a way around this? Appreciate your suggestion.

  • If you have enough to do, it's worthwhile to learn the format of the XML. Make sure you back it up before making any changes though.

Viewing 2 posts - 1 through 1 (of 1 total)

You must be logged in to reply to this topic. Login to reply