Transaction job and optimization job

  • I have Transaction job running at 4:00 and optimization job running from 3:40 to 4:40. Can they run at the same time?Thank you

  • Krasavita (7/28/2009)


    I have Transaction job running at 4:00 and optimization job running from 3:40 to 4:40. Can they run at the same time?Thank you

    If the optimization job is running from 3.40 to 4.40 and your transaction log backup job starts at 4, obviously these two jobs will overlap.

    I assumed transaction job means transaction log backup job. Is it something else?



    Pradeep Singh

  • Yes,it is transaction job

Viewing 3 posts - 1 through 2 (of 2 total)

You must be logged in to reply to this topic. Login to reply