August 26, 2008 at 2:58 am
Hi,
My project requires track of major events in calendar.(time dimension).
it iz week based dimension. but it requires to track from_date to_date of such events.
how to do it. Please advise me in this regard.
Thanks,
Regards
Viji
August 26, 2008 at 5:28 am
This sounds like a database design issue, not an SSIS issue. If I'm wrong, please post more details, like the design of your tables & flat files and the type of data you're trying to transform.
Viewing 2 posts - 1 through 1 (of 1 total)
You must be logged in to reply to this topic. Login to reply